- Hooton Engineering was the principle contractor for this job
- Designed in kit form for ease of site assembly
- 90% of the flats were accommodated by the modular design
- Site removal with minimal disruption to residents
- Site staff accommodated in the local vicinity for duration of contract
- Materials stored in storage unit in local vicinity
- Site installation and removal complete in 1 day using the modular design
- Contract duration was 18 months – Hooton Engineering completed the job in 7 months
- Customer very happy
Client:
Housing Association
Brief:
Replace wooden stair rails with stainless steel stair rails
Scope of Work:
Manufacture in house 52 complete sets of handrails for 2 and 3 storey flights of stairs